32/53 E-Y-7           Return to MSR&LHA Home page

The end result. The short ends have been forged down, the two holes located, the holes drilled, the excess length sawed off, and the bolts dropped in for show-and-tell. Follow along and see how it was done. No doubt the pros at Climax did it much quicker than we did.

Photo by Bill Liebman
Jalbum 8.5